Friday, December 11, 2009

The circular driveway is now open near the ER entrance.








The circular driveway is now open near the ER entrance. Glass and metal are completely installed on the west, south and east sides of the new structure. The roof over the gift shop is finished and this week they will begin demolishing the gift shop and Health Information Services area on the main level. The loading dock is now operational.

The 3rd picture is a south view on third floor. The picture is a waiting area for The Birth Place. The other two pictures show the east side of the new construction.